| |
|
Work
Activities |
Cost |
|
Flood Control |
5,789.00 |
|
Shoulder/Ditching |
288,221.56 |
|
Surface Material |
199,574.00 |
|
Surface Patching |
1,628,526.71 |
|
Surface Sealing |
184,534.36 |
|
Culverts |
34,842.17 |
|
Weed/Brush |
95,179.91 |
|
R/W Fencing |
0.00 |
|
Engineering & Inspections |
0.00 |
|
Signage |
40,967.48 |
|
Bridge |
340.00 |
|
Other Maintenance |
83,696.12 |
|
|